Crl Components Inc Part Number DD101 LONG LEAD - Get an Instant Quote

Part Number:  DD101 LONG LEAD
Manufacturer:  crl components inc
NIIN:  00-678-8157
Item Name :  capacitor fixed ceramic dielectr
CAGE Code:  71590
INC Code:  00007
Country:  USA
NCB Code:  00
Last Updated:  05-24-2025

Part Number DD101 LONG LEAD described as Capacitor Fixed Ceramic Dielectr with NSN 5910-00-678-8157 with FSC 5910 Capacitors by Manufacture Crl Components Inc is available in stock. We provide comprehensive database of aerospace and aviation components, sub-assemblies, and completed assemblies allows us to respond to your RFQ within 15 minutes.

Simplified Purchasing is owned and operated by ASAP Semiconductor, an industry-leading AS9120B, ISO 9001:2015, and FAA AC 0056B certified distributor of Crl Components Inc aerospace and aviation parts like DD101 LONG LEAD. We are a service-oriented company that provides quality NSN components with an emphasis on United States export law through our delivery centers at 2 strategic locations, California and Nevada. 

Please fill all fields in the RFQ form for DD101 LONG LEAD. This will help us understand your requirements and ensure timely delivery. A dedicated product expert will contact you shortly.

Note : We Will Not Share Your Information To Any Third Parties.

Please fill out below form for DD101 LONG LEAD

Contact Information

“*” Required Fields Are Compulsory
   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Disclaimer: This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/customer-terms-and-conditions/ . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without 6RE77 is void.

NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-678-8157

Item Description:

Capacitor Fixed Ceramic Dielectr

59100067881570P
CIICHCCESDPMICCriticalityENAC
UA0
Part NumberISCRNVCRNCCHCCMSDSSADC
61047531C9

Characteristics Data of NSN 5910-00-678-8157, 5910006788157

MRCCriteriaCharacteristic
AAQLBODY STYLEW-O MTG FACILITIES RADIAL TERMINALS
AARGRELIABILITY INDICATORNOT ESTABLISHED
ABJTTERMINAL LENGTH1.500 INCHES MINIMUM
ABPMBODY DIAMETER0.290 INCHES MAXIMUM
ADAQBODY LENGTH0.156 INCHES MAXIMUM
AEBSCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER0.250 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE S
AGAVEND ITEM IDENTIFICATIONMISSILE AI-TO-AIR PHOEB NIX AIM-54 TELETYPE MODEL 28 TEST CONSOLES MINI-SACE ENGINE AIRCRAFT TF33-PW-102 C-135E EC-135H-K-P MISSILE AIR-TO-AIR SPARROW AIM-7 SUPPORT EQUIPMENT MX PEACEKEEPER MISSILE SUPPORT EQUIPMENT B-
CQBQCAPACITANCE VALUE PER SECTION100.000 PICOFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-56.0- 22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION1000.0 DC SINGLE SECTION
CRTLCRITICALITY CODE JUSTIFICATIONFEAT
CRTPTOLERANCE RANGE PER SECTION-10.00 TO 10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP10000.0 MEGOHMS
CWSGTERMINAL SURFACE TREATMENTSOLDER
FEATSPECIAL FEATURESWEAPON SYSTEM ESSENTIAL
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD



Thank You for Visiting Our Website.

Don’t forget That We offer Same-Day Shipping and 24/7 Service for Our Customers.

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.

bottom to top