Part Number CK-104 LONG LEAD described as Capacitor Fixed Ceramic Dielectr with NSN 5910-00-113-5499 with FSC 5910 Capacitors by Manufacture Crl Components Inc is available in stock. We provide comprehensive database of aerospace and aviation components, sub-assemblies, and completed assemblies allows us to respond to your RFQ within 15 minutes.
Simplified Purchasing is owned and operated by ASAP Semiconductor, an industry-leading AS9120B, ISO 9001:2015, and FAA AC 0056B certified distributor of Crl Components Inc aerospace and aviation parts like CK-104 LONG LEAD. We are a service-oriented company that provides quality NSN components with an emphasis on United States export law through our delivery centers at 2 strategic locations, California and Nevada.
Please fill all fields in the RFQ form for CK-104 LONG LEAD. This will help us understand your requirements and ensure timely delivery. A dedicated product expert will contact you shortly.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Ceramic Dielectr | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
7c067104x0100f | 3 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W-O MTG FACILITIES TERMINAL S ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS BROCHURES ETC. THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT EXCLUDES COMMERCIAL CATALOGS INDUSTRY DIRECTORIES AND SIMILAR TRADE PUBLICATIONS REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION-STANDARD DATA | 81349-MIL-C-39014-2 GOVERNMENT SPECIFICATION |
Don’t forget That We offer Same-Day Shipping and 24/7 Service for Our Customers.
Request for Quote